Once the tests are complete we QA and pack the system back into it's retail box. Our tests put a greater emphasis on robustness, availability and error handling heavy loads. ![]() These tests can include extremes of workload (constant I/O's), CPU and memory use, thermal load (heat), clock speed, or voltages, bus and connectivity components, with the primary stress testing software aiming to test stability by trying to force a system to fail. This is undertaken in order to ensure stability when used in a normal environment. Our stress testing (burn-test) cycle commences for a minimum of 24 hours and extends to 48 hours if requested or required. Our pre-burn testing prepares the NAS with an initial system and drive testing cycle to ensure that the integrity of the entire system is tested and passed with no issues at all. ![]() Passed drives are then installed in the NAS with Volume and RAID set. ![]() The selected drives are batch controlled and tested using our HDD and SSD servers.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |